Step 3 Secure the parallel plate obtained from the sealing plate fitting bag to the sealing plate using
M4 screws, and then secure the sealing plate to the cabinet.
Figure A-30 Installing the sealing plates away from the aisle
(1) Column
----End

A.5 Installing a Dehumidifier

Prerequisites
Issue 04 (2017-06-30)
The aisle containment structure and air conditioners have been installed.
The dehumidifier, tray, floating nuts, and screws are ready.
Cable 25030384 and cord end terminal 14170096 are ready.
A three-way valve, PVC pipe (at least 200 mm long), female adapter, and male plug are
ready. The specifications meet the requirements of the drainage pipe of the air
conditioner.
AB glue, PVC glue, and sealing tape are ready.
Huawei Proprietary and Confidential