Avaya VSP 7200 Series Installing Manual page 45

Virtual services platform
Table of Contents

Advertisement

Figure 13: Blue release latch
• Blue locking mechanism—This locking mechanism is on the rack rails. They have a blue label
with an arrow.
Figure 14: Blue locking mechanism
- When you first install the slide rails and you fully extended the rail, you can lift the locking
mechanism to release the rail so it can slide back into the main part of the unit.
- When you install the switch in a rack and then pull the switch out, this mechanism
automatically locks the slide rail in a fully extended position.
• Retaining latch—These latches are on the front and back of the slide rails. Use the hooks on
these latches to wrap around the frame of the equipment rack and lock the rail into place.
November 2016
Installing the Avaya VSP 7200 Series
Comments on this document? infodev@avaya.com
Installing the switch in an equipment rack
45

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents