TECHNICAL FEATURES

230V AC
Main power:
230V 50Hz
Motor power supply:
230V ac
Motor power:
200W
Absorption max.:
1,5A 230V
Opening time:
circa 6 secondi
Automatic closing:
da 1 a 60 sec.
Boom max. length:
6m
Accessories:
12Vdc, 8W max
Working temperature:
da -20 a +50 °C
Radio frequency:
433,92 MHz
3.

INSTALLATION

3.1 Standard Layout

Look at the beside layout and keep a safety distance of
500 mm each side.
The length of the boom will be accordingly,
but the concrete basement position is fixed.

3.2 Basement preparation

The concrete basement must be resisting (EN206 C25/30
minimum resistance). Basement plant has to be at least
400x500 and 600 mm deep.
Keep a projection of 20 mm from the ground floor to
ensure stability.
In any case the concrete work cannot impede to stud
the fixing screws.
Do not forget wirings! While preparing the
concrete basement keep a duct of the right
dimension to connect the main power and any
additional devices, if needed.

3.3 Fixing the barrier on ground

Drill the concrete basement, put the screws provided and fix the barrier body:
24V DC
230V 50 Hz
24V dc
160W
1,2A 230V
circa 6 secondi
da 1 a 60 sec.
6m
24Vdc, 8W max
da -20 a +50 °C
433,92 MHz
Screws
Boom from 1,5 to 6m
Basement
Metal housing
4 anchor screws M16
Ground plate