Put on insulation gloves before powering on the system.
Before turning on the AC switch between the solar inverter and the power grid, check that the AC
voltage is within the specified range using a multimeter set to the AC position.
1. Set the AC output circuit breaker QF13 of the SmartACBox to ON.
2. Set the AC input circuit breakers QF01–QF05 and QF07–QF11 of the SmartACBox to ON one
by one.
3. Set the AC input circuit breakers QF01–QF05 and QF07–QF11 of the SmartACBox to ON one
by one.
4. Turn on the DC switch (if any) between the PV string and the solar inverter.
5. Turn on the DC switch at the bottom of the solar inverter.
6. Observe the LED indicators to check the operating status of the solar inverter