Download Print this page
Huawei SUN2000-4.95KTL-JPL0 Quick Manual

Huawei SUN2000-4.95KTL-JPL0 Quick Manual

Hide thumbs Also See for SUN2000-4.95KTL-JPL0:

Advertisement

Quick Links

SUN2000L-(4.125KTL–4.95KTL)-JP and SUN2000-
4.95KTL-JPL0 Replacement
Quick Guide
Issue: 01
Part Number: 31500GLE
Date: 2021-12-25
HUAWEI DIGITAL POWER TECHNOLOGIES CO., LTD.

Advertisement

loading

Summary of Contents for Huawei SUN2000-4.95KTL-JPL0

  • Page 1 SUN2000L-(4.125KTL–4.95KTL)-JP and SUN2000- 4.95KTL-JPL0 Replacement Quick Guide Issue: 01 Part Number: 31500GLE Date: 2021-12-25 HUAWEI DIGITAL POWER TECHNOLOGIES CO., LTD.
  • Page 2 3. Before replacing the device, check whether the configurations of SUN2000L-(4.125KTL– 4.95KTL)-JP and SUN2000-4.95KTL-JPL0 can be viewed. If they can be viewed, record the parameter settings for setting or checking parameters after the replacement.
  • Page 3 3. Remove the DC connectors and use a cable cutter to cut off the terminals of DC input power cables. Set the cables aside for future use. The DC terminals of SUN2000L-(4.125KTL–4.95KTL)-JP must be cut off. If the DC connectors of SUN2000L-(4.125KTL–4.95KTL)-JP are directly connected to SUN2000-4.95KTL-NHL2, the SUN2000 may be burnt.
  • Page 4 Removing SUN2000L-(4.125KTL–4.95KTL)-JP 2. Remove the two hex screws. 1. (Optional) Open the anti-theft lock. 3. Remove the SUN2000 from the rear panel. Installing SUN2000-4.95KTL-NHL2 1. (Optional) Install the locking screw for the DC switch.
  • Page 5 3. Install the hanging kit delivered with SUN2000- 2. Remove the native hanging kit from 4.95KTL-NHL2. SUN2000-4.95KTL-NHL2. Not used • The marking-off template, mounting bracket, and M6x60 expansion bolts delivered with SUN2000-4.95KTL-NHL2 are not used during replacement. • Prepare an anti-theft lock suitable for the lock hole diameter (Ф8 mm) and ensure that the lock can be installed successfully.
  • Page 6 Completing Electrical Connections of SUN2000-4.95KTL-NHL2 1. Install the PE cable for SUN2000-4.95KTL-NHL2. Before connecting cables, ensure that the DC switch on the SUN2000 and all the switches connected to the SUN2000 are set to OFF. Otherwise, the high voltage of the SUN2000 may result in electric shocks.
  • Page 7 4. Install DC input power cables for SUN2000-4.95KTL-NHL2. • Ensure that the PV module output is well insulated to ground. • Use the positive and negative Staubli MC4 metal terminals and DC connectors supplied with the SUN2000. Using incompatible positive and negative metal terminals and DC connectors may result in serious consequences.
  • Page 8: Post-Installation Check

    Pull the DC input power cables back to Click ensure that they are connected securely. Extension cables for DC terminals 5. Install signal cables for SUN2000-4.95KTL-NHL2. COM port (COM) Checking the Installation of SUN2000-4.95KTL-NHL2 and Powering On the SUN2000 Post-Installation Check Acceptance Criteria The SUN2000 is installed correctly and securely.
  • Page 9 4. Turn on the DC switch at the bottom of the SUN2000. Commissioning SUN2000-4.95KTL-NHL2 1. Download and install the latest installation package of the app. Method 1: Search for FusionSolar in Huawei AppGallery. Method 2: Visit https://solar.huawei.com using your mobile phone browser. Method 3: Scan the QR code. FusionSolar...
  • Page 10 2. Access Device commissioning. Scenario 1: Your phone is not Scenario 2: Your phone is connected to the Internet. connected to the Internet. When your phone is connected to the Internet, Device commissioning is not displayed after you tap ..3.
  • Page 11 4. Choose Maintenance > Device replacement, select the type of the original device, and complete the replacement. Restore the device to its factory settings before replacement. Select a model for device replacement, set the grid code, time zone, and time, and complete the protocol replacement.
  • Page 12 6. Connect the SUN2000 to the management system. SmartLogger1000 Networking Choose Maintenance, log in to the SmartLogger1000 as Advanced User or Special User, and choose Device Mgmt. to connect the new SUN2000 to the system. Connect the new SUN2000 to the system. SmartLogger1000A/SmartLogger3000 Networking Connect to the SmartLogger WLAN.
  • Page 13 You can also manage devices on the SmartLogger WebUI. Log in to the SmartLogger WebUI as Advanced User or Special User for the SmartLogger1000 or 1000A, or as an admin user for the SmartLogger3000. Choose Maintenance > Connect Device to connect the new SUN2000 to the system.
  • Page 14 You can also complete historical data inheritance in the FusionSolar app. Log in to the app and choose Device management > Device Replacement to replace the SN of the old SUN2000 with the SN of the new SUN2000. The historical data of the old SUN2000 will be inherited.
  • Page 15 Therefore, put on protective gloves and dielectric boots and begin operating the SUN2000 with specialized insulation tools five minutes after the power-off. Removing Cables from SUN2000-4.95KTL-JPL0 for Future Use 1. Power off the SUN2000 to be replaced.
  • Page 16 4. (Optional) Remove the signal cable connector from the COM port for future use. COM port (COM) 5. Disconnect the PE cable and remove the crimped OT terminal. Set the cable aside for future use. Removing SUN2000-4.95KTL-JPL0 1. (Optional) Open the anti-theft lock. 3. Remove the SUN2000 from the mounting bracket.
  • Page 17 2. Install the SUN2000. 3. (Optional) Install an anti- theft lock. • The marking-off template, mounting bracket, and M6x60 expansion bolts delivered with SUN2000-4.95KTL-NHL2 are not used during replacement. • Prepare an anti-theft lock suitable for the lock hole diameter (Ф10 mm) and ensure that the lock can be installed successfully.
  • Page 18 Huawei Digital Power Technologies Co., Ltd. Huawei Digital Power Antuoshan Headquarters Futian, Shenzhen 518043 People's Republic of China solar.huawei.com...

This manual is also suitable for:

Sun2000l-4.125ktlSun2000l-4.95ktl