Ferroli MERCURY 2 Installation And Operation Manual page 42

Table of Contents

Advertisement

Available languages

Available languages

MAINTENANCE
CHECK BEFRE START_UP
Before starting, check the following:
1. The anchoring of the unit to the ceiling;
2. The connection of the ducts;
3. Check the condensate discharge functioning
3. The connection of the ground wire;
4. The tightness of all the electrical terminals.
ORDINARY MAINTENANCE
BEFORE PERFORMING ANY MAINTENANCE OPERATIONS, MAKE SURE THAT THE MACHINE IS NOT
AND CANNOT BE ACCIDENTALLY POWERED. CONSEQUENTLY, THE POWER SUPPLY MUST BE
DISCONNECTED FOR ALL MAINTENANCE FOT EACH MAINTENANCE OPERATION.
• The purchaser is responsible for ensuring that all maintenance operations are performed.
• The maintenance operations must be performed by trained and qualified personnel only.
• If the unit needs to be disassembled, always use protective work gloves.
19

Advertisement

Table of Contents
loading

Table of Contents