INSTALLATION
Remove the cardboard packaging and / or plastic film and all guards before installation.
The machine must always be handled by two people and / or with suitable lifting means for the larger sizes.
Apply four or six threaded rods M8 (not provided) to the ceiling with bolts (not supplied) or other fasteners.
Make sure that the components used are rated to support the weight of the machine.
Unit weight
The length of the bars depends on the distance between the ceiling and the false ceiling. The spacing of the
bars must comply with the measures of the drawing below.
INSTALLATIONS
21
31/38
kg
70
90
21 horiz
31/38 horiz
41/81 horiz
21 vertical
31/38 vertical
41/81 vertical
14
41/81
91
101
135
175
190
A
B
C
50
230
230
50
230
230
60
275
275
60
285
285
60
285
285
60
385
385
D
708
1148
1698
708
1148
1698