Download Print this page

Ambirad VISION VSXE Assembly & Instruction Manual

Radiant tube heaters

Advertisement

Quick Links

A
SSEMBLY
R
ADIANT
INDEX
Introduction & Document Index
Installation Requirements -------------------------------------------------1
Assembly Instructions------------------------------------------------------2
User and Operating Instructions ----------------------------------------3
WARNINGS
AmbiRad equipment must be installed and maintained in accordance with the relevant
provisions of the Gas Safety (Installations and Use) Regulations 1998 for gas fired products.
Due account should also be taken of any obligations arising from the Health and Safety at
Works Act 1974 or relevant codes of practice. In addition the installation must be carried out
in accordance with the current IEE wiring regulations (BS 7671), BS 6896 (Industrial &
Commercial) and any other relevant British Standards and Codes of Practice by a qualified
installer. All external wiring MUST comply with the current IEE wiring regulations.
I
NSTRUCTION
V
FOR
ISION
T
UBE
M
ANUAL
VSXE
®
H
EATERS
Section

Advertisement

loading
Need help?

Need help?

Do you have a question about the VISION VSXE and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Ambirad VISION VSXE

  • Page 1 User and Operating Instructions ----------------------------------------3 WARNINGS AmbiRad equipment must be installed and maintained in accordance with the relevant provisions of the Gas Safety (Installations and Use) Regulations 1998 for gas fired products. Due account should also be taken of any obligations arising from the Health and Safety at Works Act 1974 or relevant codes of practice.
  • Page 2: Installation Requirements

    Model Definitions 1998. Due account should also be taken of any obligations arising from the Health and Safety VSXE = AmbiRad Vision High efficiency U Tube at Works Act 1974 or relevant codes of prac- heater with forced burner, heat exchanger, tice.
  • Page 3 2. Assembly Instructions. PLEASE READ this section prior to Please ensure that all packaging is assembly to familiarise yourself with the disposed of in a safe environmentally components and tools you require at the friendly way. various stages of assembly. Carefully open the packaging and check the contents against the For your own safety we recommend the parts and check list.
  • Page 4 bracket on the fan side radiant tube. Position U bolt tube alignment sections over the tube and through bracket prior to clamping. All reflectors must be positioned/ attached to the brackets exactly as detailed in the assembly drawings. 2.2.7 End Caps 2.2.4 U Bend.
  • Page 5 Figure 1. Vision Heater Assembly: Models VSXE U tube 20/25/30kW.
  • Page 6 Figure 2. Vision Heater Assembly: Models VSXE U tube 35/40/45kW.
  • Page 7 Figure 3. Vision Heater Assembly: Models VSXE U tube 50kW.
  • Page 8 Brierley Hill West Midlands DY5 1QA United Kingdom Telephone 01384 489700 Facsimile 01384 489707 Email info@ambirad.co.uk Website www.ambirad.co.uk AmbiRad is a registered trademark of AmbiRad Limited. Because of continuous product Technical Support www.s-i-d.co.uk innovation, AmbiRad reserve the right to change product specification without due notice...