15 Control equiment
Checking should be made the first time after 6 months in operation, thereafter at least byt intervals of 12 months.
Electrical cubicle, control functions, user terminals
15.1
Check that all equiment is properly mounted.
Check all equpiment regarding contamination,
15.2
corrosin and damage
15.3
Check safe protections
15.4
Check all connections and fastenings
Check the function of all movable equpiment,
15.5
i.e. damper motors, pumps etc
Check the function of all sensors and safetey
15.6
arrangements, i.e. frost protection and safety
15.7
Check terminals and read off components
15.8
Check settings, i.e switch clock
Set values, regulation functions
Measure and check input signals according to
15.9
set values
Measure and check electric, electronic and
15.10
phneumatic signals and functions
Measure and check physical values, i.e. tem-
15.10
peratures, air flows etc
15.11
Set up a protocol
Mjukvara
15.12
Make backup/safety copy
15.13
Check if updatings are available
The company reserves the right to make design changes without prior notice.
Activity
valves
Action
Fix if required
Clean and repair/replace
Fix if required
Fix if required
Fix if required
Fix if required
Fix if required
Fix if required
Fix if required
Fix if required
Update
EN.SILVER.110322
Months
1
3
6
12
24
x
x
x
x
x
x
x
x
x
x
x
x
x
x