Instructions for installation and use
Cooling from the water heater alone:
During tapping, the level of cooling will Typeically be 30–35°C. When
hot water is not being tapped, it is completely normal for the return
temperature from the water heater to rise slightly. In this situation,
the district heating meter will register very modest consumption as
the volume of water is very small.
On water heaters with recirculation, the calorie meter registers the
heat loss in the circulation pipe.
Tightening of connections
Retighten all connections after reading of the heat meter. If case of
leaks, contact your professional provider for assistance.
Please note that the connections may feature EPDM rubber gaskets!
Therefore, it is important that you DO NOT OVERTIGHTEN the
union nuts. Over-tightening may result in leaks. Leaks caused by
over-tightening or failure to retighten connections are not covered
by the warranty.

10.1 Maintenance schedule (recommendations)

Interval
Maintenance work
Check all connections for leaks
Check that the safety valve on the cold water supply is
functioning correctly.
Check that all components are intact and functioning as
intended
Clean all dirt filters/strainers in the substation
Check that any electrical cables are in serviceable condition
At least once a year
and that it is possible to disconnect the electrical power sup-
ply to the substation
Check the pipes and exchanger for signs of corrosion
Check that any insulation covers are functioning as intended
Check that the temperature regulators are set in accordance
with the instructions in this manual
Check the functions of all shut-off valves
IMPORTANT! Replace gaskets after separation of parts
16 | © Danfoss | Produced by Danfoss Redan A/S | 2016.03
Akva Lux II TDP RENO
Comments
If you identify a leak, replace the gaskets and retighten the pipe connec-
tions
Check the functionality by turning the lever on the safety valves
In the event of irregularities, lack of functionality or visible faults and
defects in a component, replace the component in question
Replace any filters that are not intact
Visual check. Check whether it is possible to disconnect the current to the
substation.
Visual check. In the event of signs of corrosion, replace pipes or heat
exchanger inconsultance with Danfoss A/S
Check that the insulation fits tightly around the product
Follow the instructions in the present manual
Check that the ball valves open and close as they should
VI.JV.R1.02