Delivery; Package Contents; Check The Delivery; Packaging Tips - privileg SY-103G1-E1-C59-L52-900 User Manual

Wall exhaust hood
Table of Contents

Advertisement

Available languages

Available languages

Delivery

Package contents

(1) Exhaust hood
(2) flue screen, upper and lower part
(3) Exhaust air operation: Exhaust air hose
(4) Exhaust air operation: Check valve
(5) Wall bracket for upper flue screen
(6) Retaining plate for lower flue screen
(7) 4 plate screws 4.0 × 8 mm for fixing the
flue screen
(8) Cable ties
The screws and dowels required to
mount the appliance on a wall are not
included in the package contents as their
(1)
type and dimensions will vary depending on
the characteristics of the wall. Please have
a specialist advise you as to which ones you
need see „Materials required for assembly"
on page EN-10).
(2)
An activated charcoal fi lter for air circulation
is not included in the package contents. To
order accessories, see see „Our Service
(2)
Centre" on page EN-22).
(3)

Check the delivery

(4)
1. Unpack the appliance.
(5)
2. Leave the blue protective film on the met-
al surfaces!
(6)
3. Remove all other parts of the packaging,
plastic profiles, tape and foam padding.
4. Check that the delivery is complete.
(7)
5. Check whether the appliance was dam-
aged during transit.
(8)
6. If the delivery is incomplete or the appli-
ance has been damaged during transport,
please contact our Service team, see
page EN-22.
WARNING!
Never use a damaged appliance.

Packaging tips

If you have sufficient space, we rec-
ommend keeping the packaging, at
least during the warranty period. If
the appliance needs to be sent out for repairs,
only the original packaging will provide suffi-
cient protection.
If you would like to dispose of the packag-
ing, please dispose of it in an environmentally
friendly way.
Page EN-3
Delivery

Advertisement

Chapters

Table of Contents
loading

Table of Contents