Electrical Connection - BÖWE M12 Installation Instructions Manual

Hide thumbs Also See for M12:
Table of Contents

Advertisement

7
Connection
7.3

Electrical Connection

Only trained electricians are permitted to work on the electrical
system.
Caution
Note the supply voltage (on the nameplate). Connect L1 /L2 /L3, neutral and ground wires with
the appropriate cross section and fusing. Pass the cable into the switch panel through the PVC
screwed union provided and connect to terminal.
Main switch connection
The main switch must be connected at the customer with an approved cable. Strip the cable right
before the main switch only. Do not lay stripped cable in the cable trunking.
Ground-fault circuit interrupter at the customer
In case of a fault current breaker integrated in the building it is recommandable
to make sure, if it is applicable to the machine with variable speed drive.
M12-M15-M18
400 V, 50 Hz
Steam /electric without distillation
Steam /electric with distillation
230 V, 60 Hz
Steam /electric without distillation
Steam /electric with distillation
44
44
Operating load
Max. current
kW
A
7 /16
25 /38
8 /27
26 /53
7 /16
43 /65
8 /27
45 /91
7
7.3
Fuse
A
32 /50
32 /63
50 /80
50 /100
M12-M15-M18

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for BÖWE M12

This manual is also suitable for:

M15M18

Table of Contents