Connect Fill Hose To Fill Valve - Maytag MDB9959SKZ Owner's Manual

Hide thumbs Also See for MDB9959SKZ:
Table of Contents

Advertisement

14.
Flexible line
Flexible braided line: Confirm the flexible braided line is long
enough.
15.
Add 90° elbow fitting to the water
supply line
Get 3/8" compression x 3/4" hose fitting with 90° elbow.
Connect the 3/8" compression fitting of the 90° elbow fitting to
the water supply line. Attach such that the 3/4" connection is
facing upward as shown above.

CONNECT FILL HOSE TO FILL VALVE

16.
Tighten 90° elbow fitting to valve
Be sure rubber washer is properly seated in fitting. Slide the
3/4" (19 mm) fitting of the 90° elbow up to the valve and hand
tighten it to avoid cross-threading. Hand tighten until the coupling
is tight.
Using pliers, check the tightness of the coupling. An additional
1/4 to 1/2 turn may be required to seal the rubber gasket. Route
fill hose out the rear left side of unit.
NOTES:
Do not use tape with compression fittings.
Do not over-tighten. Damage to the coupling can result.
Elbow fitting
17

Advertisement

Table of Contents
loading

Table of Contents