Riello Burners Gulliver RS5D Installation, Use And Maintenance Instructions page 31

Forced draught gas burner, two stage operation
Table of Contents

Advertisement

Available languages

Available languages

3.3
GAS FEEDING LINE
Fig. 6
1
– Gas supply pipe
– Manual cock (charged to the installer)
2
– Gas pressure gauge (charged to the installer)
3
4
– Filter
5
– Gas pressure switch
6
– Safety valve
7
– Pressure governor
– 1 st and 2 nd adjusting valve
8
M1 – Gas-supply pressure test point
M2 – Pressure coupling test point
GAS TRAIN ACCORDING TO EN 676
GAS TRAIN
TYPE
MB-ZRDLE 410 B01
MB-ZRDLE 412 B01
MB-ZRDLE 415 B01
The gas train is supplied separately, for its adjustment see the enclosed instructions.
3.4
PROBE - ELECTRODE POSITIONING,
Fig. 7
1
2
3.5 ±
0.3
D4020
2814
1
2
3
CONNECTIONS
CODE
INLET
3970542
Rp 1" 1/4
3970543
Rp 1" 1/4
3970582
Rp 1" 1/2
ATTENTION
Verify that the plate (1) is always inserted in the
flattening of the electrode (2).
PLATE
M1
4
5
6
OUTLET
Flange 3
Natural gas
Flange 3
Natural gas
Flange 3
Natural gas
(see fig. 7)
31 ±
0.3
ELECTRODE
Lean the probe insulator against the cup
PROBE
5
GB
7
8
USE
200kW and LPG 160
– 345 kW
300 kW
300 kW
CUP
M2
D5208