Installation Instructions
SECOND FIX - Installing the unit
5. Ensure that there is enough space for the
condensate drain to be fitted and ducts
to be connected.
Ensure that the slope to the drain is
maintained.
6. Prepare the drain. All MVHR units
produce condensate. The condensation
drain should be located at the lowest
point in the foam moulding as shown
overleaf. It is recommend that the drain
is prepared before the unit is assembled
to the ceiling.
09