Download Print this page

Sealey AP1205 Instructions Manual page 3

Heavy duty steel workbench with 4 drawers & 2 top cabinets

Advertisement

4. ASSEMBLY
NOTE:
tools required for assembly: spanner (included),
#2 cross-head screwdriver and pliers (not included).
4.1.
use 8 aa bolts, 8 BB nuts and 8 cc washers. align holes
on cross bracing (3L) and (4L) to table legs (1L and 2L).
Insert 8 (aa) bolts through matching holes as shown above
- four bolts per cross bracing. fasten with 8 washers (cc)
and 8 nuts (BB).
Do not over tighten.
Fig.3
4.3.
use 16 aa bolts, 16 BB nuts and 16 cc washers.
align holes from cross bracing pieces (5 and 8) to the
complete table leg ends from previous steps. Ensure labels
on pieces (5 and 8) have arrows facing up and square holes
are on the top. Insert 2 (aa) bolts through left and right side
of lower front cross bracings (5) - fasten with 2 washers
(cc) and 2 nuts (BB). repeat for lower back cross bracing
(8). repeat steps for top cross bracing pieces (6 and 7),
ensure labels on pieces (6 and 7) have arrows facing up
and round holes are on the top. Do not over tighten.
Fig.1
4.2.
use 8 aa bolts, 8 BB nuts and 8 cc washers.
align holes on cross bracing (3r) and (4r) to table legs
(1r) and (2r). Insert 8 (aa) bolts through matching holes
as shown above - four bolts per cross bracing.
fasten with 8 washers (cc) and 8 nuts (BB).
Do not over tighten.
NOTE:
If you wish to install the drawers on the LEFT side, go to
steps 4.22 to 4.27.
Installation of drawers on left side will take an additional
1 hour approximately.
4.4.
use 4 aa bolts, 4 BB nuts and 4 cc washers.
take centre wall (9), with drawer rails facing to the right of
the table, and fasten to frame of table using 4 (aa) bolts,
4 (cc) washers and 4 (BB) nuts.
Do not over tighten.
Original Language Version
Fig.2
Fig.4
ap1205
Issue no.1 25/09/11

Advertisement

loading