Download Print this page

Sealey AP1205 Instructions Manual page 8

Heavy duty steel workbench with 4 drawers & 2 top cabinets

Advertisement

4.21.
Empty the drawer and fully extend before removing.
Lift or lower (depending on the slide) the release lever on
both sides. slowly pull the drawer out to remove from table.
to re-install, align the drawer rails and slowly push the
drawer into the table until the drawer stops.
Go to step 4.28.
Fig.23
4.23.
use 4 aa bolts, 4 BB nuts and 4 cc washers.
take centre wall (9), with drawer rails facing to the left of
the table, and fasten to the frame of the table using 4 (aa)
bolts, 4 (cc) washers and 4 (BB) nuts.
Do not over tighten.
Fig.21
Fig.22
4.22.
Fig.24
4.24.
Original Language Version
Reversing Drawer Rails
for Left Hand Fitment
remove both screws attaching drawer rails to centre walls.
flip drawer rails 180º to face the other direction and fasten
with both screws. repeat the above steps for the other
three drawer rails.
use 12 aa bolts, 12 BB nuts and 12 cc washers.
take the pegboard (11) and place it against the back
of the table frame so that the power bar hole (pB) is on the
bottom right as shown above. align screw holes
of pegboard (11) against the holes of the table frame.
taking the left and right pegboard frame (10L and 10r),
sandwich the pegboard between (1L) and (10L). repeat
this procedure, sandwiching pegboard between (1r) and
(10r). fasten pegboard frame against frame of table by
using 6 (aa) bolts, 6 (cc) washers and 6 (BB) bolts on each
side. Do not over tighten.
ap1205
Issue no.1 25/09/11

Advertisement

loading