Reboot/Power Down For 3 Chassis System; Reboot/Power Down For 4 Chassis System - NEC SV8100 Quick Start Manual

How to reboot or power down
Table of Contents

Advertisement

1. On the top chassis, press the power switch to the off position
2. On the bottom chassis, press the power switch to the off position
3. The system will power down, leave the system powered off if required (Due to electrical
work being carried out)
4. Alternatively, count to 10 and then press the power switch to the on position on the top
chassis
5. Press the power switch to the on position on the bottom chassis
6. The system should be up and operational within 5 minutes.

Reboot/Power Down for 3 Chassis System

In the event of a reboot or complete power down, if you have 3 chassis', please follow the
instructions below.
1. On the top chassis, press the power switch to the off position
2. On the middle chassis, press the power switch to the off position
3. On the bottom chassis, press the power switch to the off position
4. The system will power down, leave the system powered off if required (Due to electrical
work being carried out)
5. Alternatively, count to 10 and then press the power switch to the on position on the top
chassis
6. Press the power switch to the on position on the middle chassis
7. Press the power switch to the on position on the bottom chassis
8. The system should be up and operational within 5 minutes.
Reboot/Power Down for 3 Chassis System
In the event of a reboot or complete power down, if you have 4 chassis', please follow the
instructions below.
1. On the top chassis, press the power switch to the off position
2. On the middle chassis, press the power switch to the off position
3. On the next chassis, press the power switch to the off position
4. On the bottom chassis, press the power switch to the off position
5. The system will power down, leave the system powered off if required (Due to electrical
work being carried out)
6. Alternatively, count to 10 and then press the power switch to the on position on the top
chassis
7. Press the power switch to the on position on the middle chassis
8. On the next chassis, press the power switch to the off position
9. Press the power switch to the on position on the bottom chassis

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SV8100 and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents