Kohler REVIVAL Series Installation Instructions Manual

Kohler REVIVAL Series Installation Instructions Manual

Deck-/bath-mount bath faucet

Advertisement

Quick Links

1. BEFORE YOU BEGIN

HOW TO USE THESE INSTRUCTIONS
Please read these instructions carefully to familiarize
yourself with the required tools, materials, and installation
sequences. Follow the sections that pertain to your
particular installation. This will aid you in avoiding the
unnecessary
expense
Installation. In addition to proper installation, read all
operating and safety instructions.
MODEL NUMBERS
S
K-T16119
S
K-T16122
S
K-T16124

PRODUCT REQUIREMENTS

S
Deep rough-in kit #73444 allows an additional 1/2"
(1.3cm) of tile thickness.
S
Plaster guard diameters are approximately 1-5/8"
(4.1cm) for the valve and 7/8" (2.2cm) for the spout.
S
Installer-supplied copper tubing to be: 5/8" O.D.
(1/2" nominal).
S
Install water hammer arrestors in supply lines near
the valves.

TOOLS AND MATERIALS REQUIRED

S
Open end/adjustable wrenches
S
Adjustable arc pliers
S
1/2" Nom. (5.8" O.D.) tubing
S
Tubing Cutter
S
Hole cutting equipment
S
Soldering equipment and supplies
S
Phillips screwdriver
Roughing-In Dimensions – SPOUT AND HANDLES
9-5/8" (24.4cm)
1-3/4"
(4.4cm)
4-3/4"
(12.1cm)
2-5/8" (6.7cm) D.
DECK-MOUNT
4-1/4"
(10.8cm)
3"
(7.6cm)
BB
113341-2-
DECK-/BATH-MOUNT BATH FAUCET
R
associated
with
improper
1-5/8" (4.1cm)
6-1/4" (15.9cm)
(scroll knob)
6" (15.2cm)
(traditional knob)
1" (2.5cm)
3" (7.6cm)
4-1/4"
(10.8cm)
2-1/2" (6.4cm) D.
LEVER
All information in these instructions is based on the latest
product information available at the time of publication.
Kohler Co. reserves the right to make changes in product
characteristics, packaging, or availability at any time
without notice.
S
S
S

INSTALLER INFORMATION

S
These
instructions
installation: installation on finished deck or bath
rim, and installation on rough (unfinished) deck (to
be covered later with tile or other finish material).
S
Leave protective sleeve on spout supply tube until
spout installation. This is an O-Ring sealing surface
which may be damaged when unprotected.
S
Finish deck material must fit closely to the
diameters of the plaster guards, especially the
spout plaster guard.
S
Provide an access panel to valves from underside
of deck.
6-5/8" (16.8cm)
1-1/8"
(2.9cm)
4-3/8"
2-5/8" (6.7cm) D.
(11.1cm)
BATH-MOUNT
1" (2.5cm)
2-1/2" (6.4cm)
1" (2.5cm)
1-1/4"
3" (7.6cm)
(3.2cm)
2-1/2" (6.4cm) D.
DOME
Fig. #1
REVIVAL
K-T16119M
K-T16122M
K-T16124M
cover
two
methods
1-5/8" (4.1cm)
6-1/4" (15.9cm)
(scroll knob)
6" (15.2cm)
(traditional knob)
3" (7.6cm)
2-1/2" (6.4cm) D.
TRADITIONAL
E2000 Kohler Co.
of

Advertisement

Table of Contents
loading

Summary of Contents for Kohler REVIVAL Series

  • Page 1: Before You Begin

    Kohler Co. reserves the right to make changes in product sequences. Follow the sections that pertain to your characteristics, packaging, or availability at any time particular installation.
  • Page 2 Tighten nut. Wood Screw Secure plate to deck or wooden support with two wood screws. Washer NOTE: Leave protective sleeve on spout supply tube un- til spout installation. Fig. #3 113341-2- Kohler Co., Kohler, WI...
  • Page 3 Solder copper tubes to valve bodies, tee and spout supply Supply tube. Solder Solder hot and cold water tubes to valve body inlets. Solder Ensure cold supply is on right hand side. Solder Supply Proceed to Section 3. Fig. #6 Kohler Co., Kohler, WI 113341-2-...
  • Page 4 Mounting Install tubing into tee. Mate copper tube from tee with spout supply tube. Pivot the valve bodies onto the two Copper pieces of copper tubing. Tube Fig. #9 Do not solder at this time. 113341-2- Kohler Co., Kohler, WI...
  • Page 5 Thread pipe plug into spout supply tube. Leave pipe plug installed until spout and handle installation. Install cardboard plaster guards over both valves and spout supply tube. Leave in place until spout and handle installation. Kohler Co., Kohler, WI 113341-2-...
  • Page 6 1-1/4” (3.2cm) rim, finished deck or tile. Tile CAUTION: Risk of product damage. Ensure all Finish burrs are removed from supply tube to prevent damage to O-Ring seal inside the sleeve. Rough Deck Fig. #15 113341-2- Kohler Co., Kohler, WI...
  • Page 7 NOTE: A spline adapter is provided in addition to the Valve Stem stem extension, and is the shorter of the two pieces. The spline adapter will not be used in deck- and bath-mount Valve Body installations. Fig. #20 Kohler Co., Kohler, WI 113341-2-...
  • Page 8 Questions? Problems? First review the installation instructions to ensure correct installation. For additional assistance, call our Customer Service Department for direct help. You may also contact us at our web site listed below. In the U.S.A. call 1-800-4-KOHLER In Mexico call 001-877-680-1310 In Canada call 1-800-964-5590 www.kohlerco.com...

Table of Contents