Operation Instruction
Document No. : silverbell LCM Dismantling SOP
Operation item :
Dismantling camera
Attention︰If abnormal condition happens, please contact foreman or assistant immediately.
Jig list(Jig specification)
Steps:
1. Unfold the acetic acid
mausoleum,pull the EDP cable
connector from the camera.
2. Dismantling camera and recovery.
QTY
Jig list(Jig specification)
Tabulation : Huang.Ya-jun
Work station:
1.00
Ver. :
Date :
Department:
13(1/1)
2019/9/18
QTY
IE