Operation Instruction
Document No. : Silverbell FA Dismantling SOP
Operation Item :
Dismantling Thermal
:
1
3
Attention︰If abnormal condition happens, please contact foreman or assistant immediately
Jig list(Jig specification)
Electric screwdriver
1.Get Thermal screw M2x3.5(6052A0051101)*4,
recovery thermal.
❖ Starter head model: #1
❖ Torque value:1.5 ± 0.3Kgf.cm
❖ The screw must not slip its teeth and into the
machine.
❖ Disassembly sequence:1 2 3 4
4
2
QTY
1
Steps:
Jig list(Jig specification)
Tabulation: Zhu.Ya
Work Station:
2019/9/18
1.00
Ver. :
Date
Department:
20(1/1)
.
QTY
IE