Download Print this page

HP 340 G7 Product End-Of-Life Disassembly Instructions page 17

Pc
Hide thumbs Also See for 340 G7:

Advertisement

Operation Instruction
Document No. : Silverbell FA Dismantling SOP
Operation Item :
Remove hinge up Screw
:
1
2
2
Attention︰If abnormal condition happens, please contact foreman or assistant immediately
Jig list(Jig specification)
Electric screwdriver
5
圖一
3
4
Steps:
1.Get Hinge UP.,remove fixed hinge
ScrewM2.5x6(6052A0029201)*4.5
2.Remove fixed Hinge to
6052A0051101)
❖ Torque:3.0 ± 0.3 Kgf.cm
❖ The screw must not slip its teeth and
into the machine.
❖ Disassembly sequence:1  2  3 
4  5
Jig list(Jig specification)
QTY
1
Tabulation: Zhu.Ya
Work Station:
1.00
2019/9/18
Ver. :
Date
MBM2X3.5(
Department:
15(1/1)
.
QTY
IE

Advertisement

loading