Installation - Xylem Lowara SEKAMATIK 10 E 5M Installation And Operation Instruction Manual

Table of Contents

Advertisement

Available languages

Available languages

up to -10% of the voltage stated on the nameplates. Make
sure that the lifting station is suitable for the electricity sup-
ply available at the installation site.
The lifting stations require no additional motor protection.
Connect the units to the mains supply.

6. Installation

The operator has to prevent damage through the flood-
ing of rooms caused by defects of the pump through the
use of appropriate measures (e.g. installation of alarm
units, backup pump or the like).
Install the disposal unit SEKAMATIK 10E 5M horizontal on
an even floor. In order to allow a low noise operation, the
distance between the unit and the wall should be 0,5 cm
min.
To connect a sanitary unit (e.g. a shower) install a DN 40
discharge hose from the outlet of the sanitary unit to one of
the inlets of the box. Please pay attention that the outlet of
the sanitary unit should be minimum 12 cm above the floor,
respectively the lower edge of the SEKAMATIK 10E 5M to
get the required descent (1 – 3%).
(Pic.1) Remove the cap, which is screwed at the inlet and
take the black sealing ring and the white plastic ring out of
the cap.
(Pic.2) Put the nut (pos. A), the plastic ring (pos. B) and the
sealing ring (pos. C) onto the DN 40 discharge pipe as
shown above and put the pipe into the inlet of the tank, till it
meets the stroke. Connect the discharge pipe by screwing
the nut at the inlet device. The black sealing ring must be
between the nut and the inlet device.
Please do the same in case you want to install any addi-
tional sanitary units.
To connect a washing machine, please take care that the
waste water gets into the SEKAMATIK 10E 5M via a funnel
or an open tube with air trap in the opening on top of the
unit
12

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Lowara baureihe series

Table of Contents