Page 2
Kurzanleitung: EYEVIS LED CUBE Kurzanleitung: EYEVIS LED CUBE Quickstart Guide 2x2 EYE-LCD-4600-SN-V2 Construction of the batch frames Connection to the frames: Use the screws and the angle from the „Picture 2“ to Connect the second frame on top (Picture1) (Picture2)
Page 3
Kurzanleitung: EYEVIS LED CUBE Kurzanleitung: EYEVIS LED CUBE Quickstart Guide 2x2 EYE-LCD-4600-SN-V2 Connection of the Frames Now connect the frames with the screws and angle on the right side LCD 1 LCD 2 LCD 3 LCD 4 (Picture5) (Picture4)
Page 4
Kurzanleitung: EYEVIS LED CUBE Kurzanleitung: EYEVIS LED CUBE Quickstart Guide 2x2 EYE-LCD-4600-SN-V2 Connection of the Frames Use the linear grill face connector to connect the frames in the middle (picture7) (Picture5) LCD 1 LCD 2 (Picture6) LCD 3 LCD 4...
Page 5
Kurzanleitung: EYEVIS LED CUBE Kurzanleitung: EYEVIS LED CUBE Quickstart Guide 2x2 EYE-LCD-4600-SN-V2 Connection: Now you can connect all Frames with the angle and the screws. LCD 1 LCD 2 LCD 3 LCD 4 (Picture8)
Page 6
Kurzanleitung: EYEVIS LED CUBE Kurzanleitung: EYEVIS LED CUBE Quickstart Guide 2x2 EYE-LCD-4600-SN-V2 Connection of the retaining brackets: Now use the drop rod to connect the retaining brackets together. (Picture8) (Picture9) (Picture10)
Page 7
Kurzanleitung: EYEVIS LED CUBE Kurzanleitung: EYEVIS LED CUBE Quickstart Guide 2x2 EYE-LCD-4600-SN-V2 Fixing the frame construction on a Wall Take the finished 2x2 frame construction and hold it on the Wall. On the retaining brackets you can see holes for the screws for mounting on the Wall (Picture11)
Page 8
Kurzanleitung: EYEVIS LED CUBE Kurzanleitung: EYEVIS LED CUBE Quickstart Guide 2x2 EYE-LCD-4600-SN-V2 Hanging the Displays When you have mounted the frames on the Wall you can hang in the Displays with the grip in (picture 11). If you are sure that you have fixed the black screw on the grip you can lift up...
Need help?
Do you have a question about the EYE-LCD-4600-SN-V2 and is the answer not in the manual?
Questions and answers