Section 5 − Installation; Selecting A Location; Installing Work Clamp - Hobart Welding Products Handler 125 Owner's Manual

Table of Contents

Advertisement

5-1. Selecting A Location

18 in.
(460 mm)

5-2. Installing Work Clamp

3
3
Tools Needed:
10 mm
OM-283007 Page 12
SECTION 5 − INSTALLATION
(460 mm)
4
5
6
2
8
18 in.
1
1
7
!
Special installation may be
required where gasoline or
volatile liquids are present −
see NEC Article 511 or CEC
Section 20.
!
Do not move or operate unit
where it could tip.
1
Grounded Receptacle
Locate unit near correct input
power supply.
.
Connection hardware must be tight-
ened with proper tools. Do not just
hand tighten hardware. A loose
electrical connection will cause
poor weld performance and exces-
sive heating of the work clamp.
1
Work Clamp
2
Work Cable From Unit
3
Insulator Grip
Slide one insulating grip over work cable
before connecting to clamp.
4
Nut
5
Lock Washer
6
Flat Washer
7
Screw
8
Work Clamp Tabs
Bend tabs around work cable.
Slide insulating grips over handles.
Ref. 802456
161062

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents