Bentone BG 300LN Installation And Maintenance  Instruction
Bentone BG 300LN Installation And Maintenance  Instruction

Bentone BG 300LN Installation And Maintenance Instruction

Advertisement

Quick Links

178 026 72-2 2016-06-20
Providing sustainable energy solutions worldwide
Installation- and maintenance instruction
BG 300LN

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BG 300LN and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Bentone BG 300LN

  • Page 1 178 026 72-2 2016-06-20 Providing sustainable energy solutions worldwide Installation- and maintenance instruction BG 300LN...
  • Page 3 DESCRIPTION BG300/400LN 1. Switch man-aut 9. Blast tube 16. Transformer 2. Switch 0-1 10. Gas nozzle 17. Gas burner control 3. Change -over switch 11. Connection gas fittings 18. Electric panel increasedecrease 12. Multibloc 19. Electrical connection 4. Indicating lamp Stage 1 13.
  • Page 4: Technical Data

    TECHNICAL DATA Type designation BG 300LN ø110 Length of Measure A Standard The above dimensions are max. measurements. Depending on the com ponents used, the measurements may vary. 172 215 53 03-01...
  • Page 5 TECHNICAL DATA Type designation BG 300LN Output range Capacity Gas volume at a min. Gas volume at a max Max. inlet Rated inlet pressure output Nm output Nm pressure mbar mbar G20 51-120 kW G25 45-120 kW 14,6 Connection Motor...
  • Page 6 9. Air pressure switch 10. Gas burner control Pos. 5b, 7: Components not required according to EN 676. Required over 1200 kW according to EN 676. Incorporated in the MultiBloc When biogas is used, Bentone shall always be contacted. 172 415 05 03-01...
  • Page 7: Mounting On The Boiler

    MOUNTING ON THE BOILER Fit the burner to the boiler by means of 4 bolts M10 (do not forget the flange gasket). For flange and bolt dimensions see Technical Data or use the fixing flange as a pattern. If for some reason you want to separate the combustion part from the fan housing part to mount the burner on the boiler, see General Instructions.
  • Page 8 * If there is no Plug-in contact (X4,X16) on the boiler, connect to the contact enclosed.
  • Page 9: Electric Equipment

    ELECTRIC EQUIPMENT List of components A1 Gas burner control S12 Change-over switch, Increase- A2 Power control Reduce B1 Ionization electrode S15 Control thermostat, 3-pole F1 Operating fuse (only for 2-stage sliding) H1 Operating lamp Ignition transformer H3 Alarm signal 230 V Connection terminal board M1 Burner motor Earth terminal...
  • Page 10: Electrical Equipment

    ELECTRICAL EQUIPMENT Control program when disruption; disruption display Gas burner control: LME..Colour codes Colour code table for multi-coloured signal lamps (Light diodes) Status Colour codes Colours Waiting time «tw», other waiting times Ignition phase, ignition checked Flashing yellow Normal operation Green Operation, poor flame signal Flashing green...
  • Page 11 ELECTRICAL EQUIPMENT Control program when disruption; disruption display Gas burner control: LME..Alarm control table Red flashing code on Possible causes signal lamp (LED) Flashing 2 x No flame at End of «TSA» •• - Defective or obscured flame monitor - Defective or obscured fuel valves - Poor burner installation - Defective ignition unit...
  • Page 12 MEASURES AND CHECKS BEFORE START-UP 2-Stage or modulating burners General rules Care should be taken by the installer to ensure that no electrical cables or fuel/gas pipes are trapped or damaged during installation or service/ maintenance. Inner assembly Ensure that the ignition and ionisation electrodes are correctly adjusted. The sketch (see separate page) shows the correct measurements.
  • Page 13 EASURES AND CHECKS BEFORE START-UP BG300 / 400LN Gas nozzle assembly Natural gas 12-14 172 155 05 01- 01...
  • Page 14 DETERMINATION OF GAS VOLUME FOR THE INSTALLATION Specifications on natural gas, town gas and biogas vary. For more exact information please contact the gas distributor. Net calorific value Gas quality kWh/Nm kJ/Nm kcal/Nm Natural gas 10.3 37 144 8 865 Propane 26.0 93 647...
  • Page 15 DUNGS COMBI BLOC WITH RATIO ADJUSTMENT MB-VEF BO1, 407 VIEW Check the ilter at least once a year! 1. Electrical connection gas pres- 8. Adjustment screw V for ratio P 11. Test point connection 1/8" P sure switch mini (max. load) 12. Test point connection 1/8" P 2.
  • Page 16 TECHNICAL DATA WITH RATIO ADJUSTMENT - Max inlet pressure 360 mbar - Gas family 1 +2 +3 - Valves V class A group 2 in accordance with EN - Outlet pressure 0,5 - 100 mbar - Zero point adjustment N ±2 mbar - Pressure switch DIN3398 TI - Governor class A group 2 in accordance with EN88 - Ratio V P...
  • Page 17 ADJUSTMENT OF GAS FLOW - Before the burner starts vent the lines to make sure that there is gas available at the multibloc - Use an allen key size 2,5 mm for adjusting N and V. - Connect a pressure gauge for measur-ing P , (advisable to find out if the valves are open) - Set the switch in position MAN.
  • Page 18: General Instructions

    GENERAL INSTRUCTIONS General instructions The installation of the gas burner must be carried out in accordance with current regulations and standards. The installers of gas burners should therefore be acquainted with all regulations and ensure that the installation complies with the requirements. The installation, mounting and adjustment should be made with the greatest care and only the correct gas should be used Operating instructions...
  • Page 19 GENERAL INSTRUCTIONS Adjustment of shrouded disc and burner head The burner head is firm adjusted and there are no possibilities of settings besides the adjustment and the inspection of the ignition electrode and the ionisation electrode. Inspection of burner head when multi-bloc MB...407 The burner head, the shrouded disc and the electrodes can be inspected by following the instructions below: Loosen the nut a, the nut b to the impulse line P...
  • Page 20: General Instruction

    GENERAL INSTRUCTION Flame monitoring and measurement of ionisation current The burner is monitored according to the ionisation principle. Check the ionisation current on start-up and on each service call. The reason for a low ionisation current may be leaking currents, bad connection to earth, dirt or a faulty position of the flame electrode in the burner head.
  • Page 21 GENERAL INSTRUCTION UV-detector This should not be exposed to temperatures exceeding 60°C. The current passing through the UV-detector, when it is being illuminated, should be at least 70 µ A for LFL1.. This current can be measured by means of a moving coil instrument.
  • Page 22 GENERAL INSTRUCTION Adjustment of air pressure switch The air pressure switch should stop the burner, if the air volume is reduced. The air proving device shall be adjusted in such a way that if there is insufficient air supply at the highest or lowest burner operating stage, the device operates before the supervised pressure is less than 80% of the pressure at the controlled stage and the CO content of the combustion products exceeds 1% by volume.
  • Page 23: Handing Over Of The Installation

    HANDING OVER OF THE INSTALLATION - Make repeated start attempts to ensure that the adjustments function. - Close the ball valve during operation to check that the gas switch switches off at the set value. - Remove the hose for the air pressure switch to check that the burner locks out.
  • Page 24 STÖRUNGSMÖGLICHKEITEN UND URSACHEN Gasbrenner Die Voraussetzungen eines störungsfreien Betriebes Um die Störungssuche zu erleichtern, folgt unten eine können nur durch ein abgestimmtes Zusammenwirken aufstellung über die gewähnlichsten Fehler die in einer der drei Faktoren: Elektrizität, Gasfl uss und Verbren- Gasbrenneranlage autreten können und wie diese nungsluft gewährleistet werden.
  • Page 25 FEHLURSCHE MASSNAHME Der Transformator ist beschädigt, keine Spannung Den Transformator austauschen. auf der Sekundärseite Das Zündkabel und das Ionisierungskabel sind Ändern verwechselt Keine Flammenbildung trotz tadellosem Anfahren Das Gasmagnetventil defekt Austauschen Das Gasmagnetventil öffnet nicht obwohl es Die Magnetventilspule austauschen, evtl. das Spannung erhält ganze Ventil.
  • Page 26 FEHLURSCHE MASSNAHME Die Spannung niedriger als 185 V Sich mit dem Kraftwerk in Verbindung setzen. Die Zündelektroden stören den lonisationsstrom Die Zündelektroden einstellen. Den Transformator evtl. umpolen Schlechte Erdleitung Richtige Erdleitung besorgen Phase und Nulleiter verwechselt Siehe Schaltplan und ändern Der Brenner schaltet während der Vorspülungsperiode Der Luftdruckwächter ist fehterhaft oder nicht richtig eingestellt...
  • Page 27 FEHLURSCHE MASSNAHME Überschlag in den Zündelektroden Austauschen Die Umgebungstemperatur des Gasrelais ist zu hoch Gegen Wärme isolieren, max. 60° C. Der Zündfunke ist zu schwach Den Transformator kontrollieren Schlechte Verbrennung Schlechte Zugverhältnisse Den Schornstein kontrollieren Die Rauchgastemperatur ist zu hoch Der Kessel zu hoch belastet.
  • Page 28: Declaration Of Conformity

    De par sa conformité aux normes et directives mentionnées ci- direktiv erhåller brännaren CE - märkningen. dessus, le brûleur recevra le marquage CE de conformité. Ljungby, Sweden, 141127 (27/11/14) Enertech AB Bentone Division is quality certified according to SS-EN ISO 9001 ENERTECH AB Bentone Division Box 309 Enertech AB Bentone Division är kvalitetscertifierat enligt...
  • Page 30: General Instructions For Gasburners

    GENERAL INSTRUCTIONS FOR GASBURNERS Installation Follow standards and instructions applicable to the Check that the input pressure of the gas is correct installation of gas burners Check that the dampers of the boiler are open Ensure that the electric installation is made in Check that there is water in the system accordance with existing regulations Check that thermostats etc.
  • Page 31 SERVICE AND INSPECTION CARD Installation Boiler Name: Type: Efficiency kW: Address: Burner Type: Efficiency kW: Installed by: Date: Date Flue gas Ionisa- gas/h Governor Pressure Efficiency temp tion current Fire room Chimney Measure- Before After °C µ A mbar mbar % ment Small flame...
  • Page 36 Enertech AB. P.O Box 309, SE-341 26 Ljungby. www.bentone.se, www.bentone.com...

Table of Contents