44 | FWA 4650 | Mechanical and electrical installation
5.
Mechanical and
electrical installation
Fig. 3:
WLAN-Box
!
The mains connector must be unplugged before ope-
ning the WLAN-Box.
i
The following fitting locations are suggested for the
WLAN-Box.
!
When drilling take care not to damage or impair the
operation of any electrical, hydraulic, pneumatic or
mechanical lifting platform components.
!
When deciding on the fitting location, make sure the-
re is always sufficient space around the WLAN-Box
whatever the lifting platform position (including
adjustable runways and together with the vehicle) to
avoid any risk of crushing and damage and to ensure
that the escape route is not obstructed.
!
Before drilling any holes in the lifting platform, make
sure this is authorised by the lifting platform manu-
facturer. If not, use must be made of an alternative
attachment method such as clamping, bonding or
welding on pins.
i
The list of approved lifting platforms is constantly
being updated and the latest status can be called up
in the internet through the Bosch home page.
|
1 690 706 220
2014-01-31
5.1
Installation at control column of
4-column lifting platform (suggesti-
on 1)
5.1.1

Fitting

i
WLAN-Box fitting procedure for 4-column lifting plat-
form. Fitting location:
1
2
Fig. 4:
Suggestion 1 for fitting WLAN-Box on 4-column lifting
platform
1 Control column (= front left)
2 WLAN-Box
1. Choose a fitting location on the control column.
2. Mark holes (1 x each) on both fastening strips in
accordance with the drilling pattern.