PM100 Bump Test and Calibration Station
8. When the installation is complete, click Finish to exit the Setup Wizard.
5.2 Connect to the Calibration Station
When the Bump-Calibration Station Manager software is first opened, the fields are grayed out. The software must
be connected to the Bump-Calibration Station before it can be used. There are two methods to connect the
software to the Bump-Calibration Station: A PM Link or the included USB Disk can be used.
5.2.1 Connect Using PM Link
The Bump-Calibration Station can be conveniently configured using the PM Link device. The unit can communicate
with the PM Link device using the IR communication in Unit 1 bay.
To connect using the PM Link,
1. Plug the PM Link device into a USB port on your computer.
2. Place the PM Link device in Unit 1 bay with the IR lens of the PM Link facing the IR lens of the Unit 1 bay.
3. Make sure the Bump-Calibration Station power is on indicated by the green Power LED.
4. Open the Bump-Calibration Station Manager software.
5. Make sure the "IR" option at the top of the software interface is selected.
REV – 1.0
[34-2900-0513-2 ]
11 |
P a g e