4. The distance between a single wall stovepipe and a parallel
combustible wall or ceiling must not be less than 18". The distance
between the horizontal stove pipe and the un-shielded vertical wall
through which the insulated chimney passes is determined by the Wall
Radiation Shield.
5. If an exterior installation is to be enclosed, allow for access to the base
of the Tee to facilitate cleaning.
6. The minimum distance between the bottom of the chimney and any
horizontal combustible is 12".
THROUGH WALL INSTALLATION
Unenclosed Exterior Installation
1.
Determine where the chimney will pass through the wall.
For concrete walls cut a hole slightly larger than the chimney. If the
concrete wall has a wood wall inside it follow the instructions for a
combustible wall.
For combustible walls cut and frame a hole corresponding to the
rough opening required in the table on page 3.
2.
Combustible wall:
From outside, put the exterior portion (the galvanized part with the
square plate) of the wall radiation shield in the hole. Nail the shield in
place using 4 - 2" nails or # 8 x 1 1/2" wood screws. Seal the joint
between the shield and the wall with silicone caulking.