Page 1
16572644 Edition 2 June 2009 Air Drill 5 Series Maintenance Information Save These Instructions...
Page 2
Gears (125 and 132), the planet gear shafts, the bearing surfaces Inject a few drops of Ingersoll Rand No. 10 Oil into each vane slot on the Spindle (127) and Gear Head (124) and the teeth on the in the Rotor bore before inserting the Vanes.
Page 3
Needle Bearing inserting Tool View the ground portion of the throttle valve stem through here Trigger Air port Throttle Throttle Bushing 15° valve stem Shoulder to Regulate Depth Pilot to fit I.D. of Bearing. Length of Pilot to be approximately 1/8” less than Cross section through throttle valve length of Bearing bushing and throttle valve showing...
NOTICE NOTICE Make sure the Cylinder Dowel is entered into and remains For N ratio, a Gear Head Planet Gear (125) has 13 teeth and a in the dowel hole in the Housing. When in proper position, Spindle Planet Gear (132) has 14 teeth. Do not mix, mismatch approximately 3/32”...
Need help?
Do you have a question about the 5 Series and is the answer not in the manual?
Questions and answers