Cleaning the ink system & replacing the ink

Advertisement

3. Turn on the Barak FE in E
4. Make sure all the 8 A
5. In the SIT group box, click the P
6. When air starts coming out from the nozzles, click the
7. Prepare an external pump as shown below, (you can use
10100125 - A
U
dialog box, as shown below.
TILITY
All the SITs will empty.
V
option.
ACUUM
The SITs are now completely empty.
two simultaneously).
The figure below, shows an AC pump, but, if your system is
configured for a DC pump, you should use a DC pump.
© Matan Digital Printers Ltd
M
, and open the I/O
NGINEER
ODE
V
check boxes are checked.
IR
ALVES
option.
RESSURE
Page 8 of 19