7.4 Screwing the Sensor into the Dosing Head
7.5 Commissioning
28
Screw in the sensor from the lower side into the hole of the dosing head
flange (M14 x 1.5).
Now the diaphragm breakage indication is ready for start-up.
CAUTION
Functional Check
Dip the sensor into water
-
Green LED and red LED are lighting:
Sensor and electronics are ready for operation!
-
One or more LED do not light:
Sensor or electronics are defective!
• Call GRUNDFOS service.
Carefully dry the senor.
-
Only the green LED still lights:
Sensor and electronics are ready for operation!
-
the red LED still lights:
Sensor or electronics are defective!
• Call GRUNDFOS service.
WARNING
!
Carry out a functional check before commissioning!
Do not open electronics or sensor!
Repair only by authorized qualified personnel.
DMX model 227
15.720023-V3.0