Safety
2.4
Handover to operator
► Provide these instructions and the other applicable documents to the operator.
► Instruct the system user how to operate the heating system.
► Make the operator aware of the following:
– Annual inspections and maintenance must be performed by a contractor.
– WOLF recommends concluding an inspection and maintenance contract with a contractor.
– Repair work must be performed by a contractor.
– Use only genuine WOLF spare parts.
– Do not make any technical changes to the heat generator or control components.
– The pH level must be checked after 8 to 12 weeks by a contractor.
– This guide and the other applicable documents must be kept safely in a suitable location and must
be available at all times.
The system user is responsible for the safety, environmental compatibility and energy quality of the
heating system under the German Emission Control Act/Energy Saving Ordinance.
► Inform the operator.
► Refer the operator to the operating instructions.
2.5
Declaration of Conformity
This product complies with European regulations and national requirements.