Omron R6YXGL250 Installation Manual page 84

Hide thumbs Also See for R6YXGL250:
Table of Contents

Advertisement

7
Secure two transportation jigs.
Secure two transportation jigs to the top of the X-axis arm.
2
8
Secure the robot cable.
Wind the robot cable around the side of the robot base so that it does not run on the installation portion of the base, and then
secure the cable with adhesive tapes.
2-26
Securing the transportation jigs
Eyebolt is installed on the base side.
Wall-mount model
Winding the robot cable
Eyebolt is installed on the spline side.
Wall-mount inverse model

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents