Hardware installation
4.3.1
Installation in PRIMECENTER/DataCenter Rack
For installation in a PRIMECENTER/DataCenter rack, the following parts are
required:
– Support bracket
– Two Vario support systems including system support
I
You can find general information regarding server installation in the rack
in the technical manual for the appropriate rack.
Figure 5: Preparing the rails
Ê Slightly pull apart (1) the telescopic rails (a).
Ê As shown (2), secure one end of the telescopic rail to the variable rail.
Ê Pull the telescopic rails further apart (3) until the second fixing hole is visible
in an oval opening in the telescopic rail and screw the two rails together here
(4).
Ê Repeat this procedure for the second telescopic rail.
TX150 S6
Operating Manual
Mounting the rack model
45