Dimensions, Clearances, Weight Distribution; 30Hxc 080-190 - Carrier 30HXC Series Installation, Operation And Maintenance Instructions

Screw compressor water-cooled liquid chillers and air-cooled liquid chillers
Table of Contents

Advertisement

3 - DIMENSIONS, CLEARANCES, WEIGHT DISTRIBUTION

3.1 - 30HXC 080-190

30HXC080
30HXC090
30HXC100
30HXC110
D
4
A mm
B mm
C mm
30HXC080
30HXC090
2705
950
1850
30HXC100
30HXC110 2705
950
1900
30HXC120
30HXC130
3535
950
1875
30HXC140
30HXC155
30HXC175
30HXC190 3550
950
2000
NOTE: Refer to the certified dimensional drawings supplied with the unit, when designing an installation.
A
3
3
D mm
E mm
kg
2447
2360
1000
2462
2504
2360
1000 2650
2846
2861
3220
1000
2956
2971
3283
3220
1000
3438
3
1
2
1
Evaporator
2
Condenser
3
Clearances required
for operation and
maintenance
Clearances required for
4
E
heat exchanger tube
removal. Clearances D and
E can be either on the left
or on the right hand side.
Water inlet
Water outlet
4
kg: total operating weight
Power supply
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents