9. Route the wires for the module. See the example in fig. 85.
Fig. 85 Example of wire routing
10. Fit the cover.
11. If the module is supplied with an FCC label, then place this on
the terminal box. See fig. 86.
Fig. 86 Position of FCC label
12. Fit the terminal box cover (fig. 80, B) and cross-tighten the
four screws (fig. 80, A) to 6 Nm.
Make sure that the terminal box cover is aligned with
the control panel. See section
Note
position of the control
58
FCC
16. Changing the
panel.