The installation may only be commissioned if the heating system and brine system have been filled and bled.
Caution
Otherwise the circulation pumps can be damaged.
If the installation is only to be driven by the immersion heater during the installation, ensure that the heating
Caution
system is filled and the brine pump and compressor cannot be started. This is carried out by setting the oper-
ating mode to AUX. HEATER.