CONCORD 2800 Operator's Manual page 54

Air systems
Table of Contents

Advertisement

3. Operation
a) Drop the lock pin (6) in the neutral
position.
b) On the inner arm and the outer arm, pull
down the spring loaded pin into the
detent position.
c) Remove the auger from the clamp.
d) Pull the inner arm into position, by
swinging the hopper away from the air
cart.
e) Release the detent pin on the inner arm
and lock into place.
f) Pull down the outer arm pin so the auger
is free to move from the inner arm.
Put the hopper on the ground:
5.
° For two-bin models, put the hopper in a
position vertical to the center line of the
tanks with the discharge end of the auger
between the compartment covers. From
this position the discharge end of the
auger can move between compartments
without moving the hopper.
° For three-bin models, put the hopper on
the ground in a position perpendicular to
the center tank lid. From this position the
discharge end of the auger can be moved
between compartments without moving
the hopper.
Put the auger over the lid of the desired tank
6.
to be filled.
Push the divert valve knob in to run the
7.
blower. Pull the diverter valve out to run the
auger or winch.
On three-bin models, put the spring loaded
8.
pin into the detent position before moving to
a different compartment or damage can
occur.
53

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

335038005250

Table of Contents