Triumph TR2 Service Instructions Manual page 138

Hide thumbs Also See for TR2:
Table of Contents

Advertisement

GEARBOX
(iv) Axial release loading of 2nd speed
synchro unit 25-27
lbs.
(v) Axial release loading of 3rd and
top speed synchro unit 19-21
lbs.
(iv) and (v) can be checked as shown
in Fig. 20. If it is found to be in-
Fig.
2q
(9
TO SPRING BALANCE
Fixture which can be readily manu-
factured to test Synchro Axial loading.
correct, steel shims
can be added or
removed from below the axial re-
lease loading springs to increase or
decrease respectively the axial release
load as required.
After completion of checks the main-
shaft circlip, thrust washers and con-
stant gear bushes can be removed.
The mainshaft can then be installed
into the gearbox casing, and assembled
as follows
:
(i) Second speed synchro unit in-
corporating the first mainshaft
g m .
(ii)
Thrust
washer
w i t h
three lugs to
fit splines.
(iii) Second mainshaft constant gear
and bush.
(iv) Third mainshaft constant gear,
bush and thrust washer fitted
w i t h
oil scroll towards gear.
(v) New mainshaft circlip as shown in
Fig. 21.
Fig.
21
Fitting Mainshaft Circlip with Churchill
Tool No. zoSM. 46.
(vi) Third and top speed synchro unit
with the short boss of the synchro
hub towards the mainshaft circlip
or rear of gearbox as shown in
Fig. 3. The mainshaft and ball
race can then be driven into the
gearbox casing, positioning the
gap of the circlip on the outer
ring of the bearing in line with the
atmosphere hole in the casing as
shown in Fig. 7.
(j) Assemble oil thrower on to constant
pinion shaft and press ball race on the
shaft as shown in Fig. 22, ensuring
that this goes right home and that in
Fig.
22
Fitting Bearing on to Constant Pinion
Shaft with Churchill Press No.
Sqtzr
and
Adapter from Set No. S4615

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tr3

Table of Contents