innovair RE05C1D1 Service Manual page 20

Table of Contents

Advertisement

5. Drive 1 / 2 (13mm) locking screws through frame holes into window sash (Fig.9/10)
FIG.9
6. To secure lower sash in place, attach right angle sash lock with 3 / 4 (19mm) or 1 / 2 (13mm) screw
as shown (Fig.11).
7. Cut foam seal and insert in the space between the upper and lower sashes (Fig.12).
If AC is Blocked by Storm Window
Add wood as shown in Fig.13, or remove storm window before air conditioner is installed. If Storm
Window Frame must remain, be sure the drain holes or slots are not caulked or painted shut.
Accumulated Rain Water or Condensation must be allowed to drain out.
Removing AC From Window
Turn AC off, and disconnect power cord. Remove sash seal from between windows, and
unscrew safety lock. Remove screws installed through frame and frame lock. Close (slide) side panels
into frame. Keeping a firm grip on air conditioner, raise sash and carefully rock air conditioner
backward to drain any condensate water in base of unit. Be carefully not to spill any remaining water
while lifting unit from window. Store parts with air conditioner.
FIG.10
18

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents