Download Print this page

First EMV100 800 Series Manual page 63

Product range 2008/1

Advertisement

ELECTRIC CONNECTION:
TERMINAL CONNECTION
1,2
T1 sensor – heating source sensor (collectors, boiler...)
3,4
T2 sensor – hot water tank sensor
5,6
T3 sensor – heating source sensor for higher heating circuit (boiler)
7,8
T4 sensor – hot water tank sensor in upper part of hot water tank
neutral conductor
9
neutral conductor
10
phase for boiler (burner) switching on
11
neutral conductor
12
phase of pump for secondary heating circuit
13
neutral conductor
14
phase of pump for collector heating circuit
15
phase connector for mains 230V, 50 Hz
16
neutral conductor - connector for mains 230 V, 50 Hz
WARNING:
Boiler control should be performed behind the main switch for burner but in front of boiler
thermostat. Care must be taken that differential thermostat and boiler connection are
performed at the same phase otherwise inter-phase contact can occur.
SENSOR INSTALLATION IN COLLECTOR:
Install it as immersion sensor in
collecting pipe at the top of the
collectors in provided sleeve
flow
direction
BOILER
T piece 1/2"
pipe 1/2"
For cables longer than 15m we
recommend over-voltage protection
with VDR resistor.
Thermo-shrinkable
VDR resistor
extension
conductor
DTC 100/4 TD
Grounding wires
should be connected
to special terminal
pins situated on right
side of terminal strips.
Connection
to terminal pins
tubes
sensor conductor
63
page

Hide quick links:

Advertisement

loading

Related Products for First EMV100 800 Series