Commissioning
8.7.2

Commissioning the CPU as DP Master

Prerequisites for commissioning
• The PROFIBUS subnet has been configured.
• The DP slaves are ready for operation (see relevant DP slave manual).
• An MPI/DP interface as DP interface must be configured accordingly (only CPU
318-2).
• You must configure the CPU as DP master prior to commissioning. That is, in
STEP 7 you must:
configure the CPU as a DP master,
assign a PROFIBUS address to the CPU,
assign a master diagnostic address to the CPU,
integrate the DP slaves into the DP master system.
Is a CPU 31x-2 DP/31xC-2 DP a DP Slave?
If so, you will find that DP slave in the PROFIBUS-DP catalog as already
configured station. In the DP master, assign a slave diagnostic address to
this DP Slave CPU. You must interconnect the DP master with the DP slave
CPU and specify the address areas for data exchange with the DP slave
CPU.
Commissioning
Commission CPU 31x-2 DP/31xC-2 DP as DP master in the PROFIBUS subnet as
follows:
1. Download the PROFIBUS subnet configuration (preset configuration) you have
created in STEP 7 from the PG to CPU 31x-2 DP/31xC-2 DP.
2. Switch on all of the DP slaves.
3. Switch CPU 31x-2 DP/31xC-2 DP from STOP to RUN mode.