Insert Installation - New Leader Guardian L3030G4 MultApplier Operator's Manual

Table of Contents

Advertisement

Header

Insert Installation

INSERT INSTALLATION
WARNING
Before installing the insert:
Parts Needed:
Description
Insert Unit
Capscrew - 1/2 x 1 1/4 Grade 8
Flat Washer - 1/2 Grade 8
Lock Washer - 1/2 Grade 8
Hex Nut - 1/2 Grade 8
Make sure rubber sealer hardware is loose. If not, loosen.
Figure 4A
To install insert bin:
Figure 4A - Hoist and slide insert into position between main bin's side sheets.
Figure 4B - Align front and rear mount brackets.
Make sure insert is resting on inside of main bin, and not resting on tops of side sheets.
Release tension on hoist but do not remove.
www.NewLeader.com
(800) 363-1771
Use only lifting devices that meet or exceed OSHA standard 1910.184. Never exceed
work load limits or lift equipment over people. Empty spreader before lifting. Loads
may shift or fall if improperly supported, causing injury.
Qty
1
8
16
8
8
Figure 4B
- 31 -
L3030G4 CNH
307369-AA-G

Advertisement

Table of Contents
loading

Table of Contents