Protool/Pro V6.0 Sp2 - Traeger S7-USB User Manual

Table of Contents

Advertisement

Söllnerstr. 9
92637 Weiden
info@traeger.de
+49 (0)961 48 23 0 0
6. Now you can start with your work. If you have finished work you can transfer this project to the panel by
reading the next steps.
7. Choose „Transfer Settings" from the sub menu „Transfer".
8. In the new dialog change the „Mode" to „MPI/DP" and set the „Station address" of the operator panel
(e.g. „1"). If desired you can switch the „Delta transfer" to „On" (in this example we set it „Off").
9. Press the button „Transfer" to start communication with the terminal. Your project is about to be
transferred. The WinCC flexible software is now able to communicate with your operator panel.

6.2.6 ProTool/Pro v6.0 SP2

Please be sure that the interface configuration is correct as described in
PD/PC-set interface
1. Start ProTool/Pro by using the desktop link or program entry in the start menu.
2. Choose from the menu „File" the sub menu „New" or click on the right symbol.
3. The next dialog let you select which operator panel you are using. Mark the used panel (e.g. „TP 170A")
S7-USB user manual
30 / 85
2019/10/05 05:07

Advertisement

Table of Contents
loading

Table of Contents