Storage And Handling; Erp Data Information - andrews BUFFER-GL200-8 Installation And Service Manual

Glass lined buffers
Table of Contents

Advertisement

Storage and Handling

Please take care when handling a packaged Andrews buffer vessel. The unit is heavy and
must only be moved manually within safe working practices. If the unit is to be stored before
installation, it must be placed on a secure, level surface and in a dry, frost free environment.
Precautions to be carried out prior to commencement of work:
1. Tidy area ensuring there is safe access and egress to installation place, free from trip hazards.
2. Be aware of other people who may be in the area
3. Operate any machinery in accordance with training and operating instructions
4. Visually inspect the equipment prior to use, do not use damaged equipment.
5. Safe working practices are adopted for manual handling of appliances/parts
6. Correct PPE to be worn.
The Andrews buffer vessel unit must be vertically floor mounted. Areas that are subject to
freezing must be avoided. Ensure that the floor is level and of sufficient strength to support the
"full" weight of the unit when filled with water. Pipe runs should be kept as short as possible for
maximum economy. Access to associated controls and indirect controls should be possible for
servicing and maintenance of the system.
ErP data
Model(s)
Energy efficiency class
Standing loss (kWh/24h)
Storage volume V in Litres
Table 3: ErP Data Information
Technical parameters in accordance with European Commission regulations 814/2013
and 812/2013
4
200
300
500
B
B
C
1.34
1.61
2.23
197
292
490
800
1000
B
C
2.14
2.76
780
970

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents