Sempell HigH Pressure Forged cHeck valves
Forged steel, swing check and tilting disc conFiguration
operating and safety instructions
These instructions summarise the main
warnings concerning the routine operations as
per the related installation and maintenance
manual.
Storage
Warning
Storage in an open area for a limited period
can be considered only in case the valves have
appropriate packing (packed incases lined with
tarred paper, and contents well protected with
barrier sacks).
• Do not place consignment packages directly on
the ground.
• Do not expose consignment packages to the
weather or directly to the sun.
• Check the packages every two months.
Handling
Warning
• Before lifting or handling the valve, make sure
you have no limitations to do it.
• For valve handling and/or lifting, the lifting
equipment (fasteners, hooks, etc.) must be
sized and selected while taking into account the
valve weight indicated in the packing list and/
or delivery note. Lifting and handling must be
made only by qualified personnel.
• Caution must be taken during the handling
to avoid that this equipment passes over the
workers or over any other place where a
possible fall could cause damage. In any case,
the local safety regulations must be respected.
emerson.com/Finalcontrol
inStallation
important
• Verify that the direction of the flow of the line
corresponds to the arrow indicated on the
valve body.
• Valves without the arrow are bi-directional.
• It is recommended to perform piping flushing
before the valve installation. If this is not
possible, the valves must be set with the disc in
full open position before starting with flushing.
• If piping system is pressurized with water for
testing, and in case the piping system has been
shut down after testing for a long time, the
following recommendations should be adopted:
a. Use corrosion inhibitor with water to
pressurize the piping system
b. After testing, the piping system should be
depressurized and the test water completely
drained.
• For operating temperatures above 200°C
(392°F) a thermal insulation of the body is
recommended.
maintenance
Warning
• Depressurize the line before starting any
maintenance. Failure to do so may cause
serious personal injury and/or damage to the
valve.
• In case of valve removal, depressurize the line
before starting any operation with the valve in
open position. Then, close the valve.
© 2017 emerson. all rights reserved.
VcoSi-02220-en 18/01

Advertisement

loading

Summary of Contents for Emerson SEMPELL

  • Page 1 Sempell HigH Pressure Forged cHeck valves Forged steel, swing check and tilting disc conFiguration operating and safety instructions inStallation These instructions summarise the main warnings concerning the routine operations as important per the related installation and maintenance manual. • Verify that the direction of the flow of the line...
  • Page 2: Parts List

    co.