Figure 10.3.3 Connection of Flue System
(Separate Ducts )
Air inlet box
Appliance connector
10.3.4 Connection of Single Pipe Horizontal/
Vertical Open Flue – 100mm
Note: the flue support cradle is not required for this
installation and should be discarded.
Refer to Figures 6.1.4 and 10.3.4. Secure the flue
elbow mounting bracket to the wall frame using 3 –
M6 nuts and washers. Locate the 90°-discharge
elbow onto the right hand mounting bracket lug and
fit the appliance connector duct between the flue
outlet in the aluminium boiler casing and the 90°
elbow. The vertical leg of this duct is telescopic to
assist with installation. Locate the air inlet terminal
into the left hand 90° elbow. Fit the remaining flue
components on route to the terminal discharge
ensuring a minimum 2° slope and that the flue
system is self supporting using wall brackets where
necessary. In terminating the flue system, ensure
that the joint through the wall / roof is made good
and weatherproofed. The top of the plastic boiler
cover has a D shaped recess that marks the
position of the vertical flue exit point. Using a
suitable fine toothed hacksaw or jigsaw, carefully cut
around the inside of the recess to provide the flue
outlet.
Having fitted the flue system to the boiler, carefully
refit the burner assembly and secure to the heat
exchanger using the 2 – M6 nuts previously
removed taking care not to damage the probes or
the burner flange gasket see Figure 10.2.
Reconnect the pressure feedback tube to the gas
valve.
HAMWORTHY HEATING LTD
ø100 Flue
ø80/100 eccentric
adapter
Flue elbow
Mounting bracket
90° support elbow
Figure 10.3.4 Connection of Single Pipe (Open Flue)
Air inlet box

10.4 Water Connections

See Figure 10.4. Care must be taken when installing
water system pipework that undue stress is avoided
on the boiler flow and return connections. It is
recommended that unions are fitted local to the
boiler and outside of the casing, to permit future
servicing requirements. Fully closing valves must
not be connected to both flow and return pipes
unless the boiler is fitted with an individual, correctly
sized
and
recommended that a 3-way 'T' port valve is fitted in
the flow connection to allow an open vent situation
should the boiler need to be fully isolated from the
system.
To ensure that the flow and return pipework are
retained
within
recommended that swept bends are not used. To
achieve this use 1
Figure 10.4
21
SHERBORNE
Air inlet
terminal
ø100 Flue
ø80/100 eccentric
adapter
Flue elbow
Mounting bracket
90° support elbow
Appliance connector
positioned
safety
the
boiler
casing,
" elbows or tees.
1/4
Water Connections
Flow
Return
S65 Model
Return
S70c Model
valve.
It
is
it
is
500001103/E

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sherborne s65Sherborne s70c

Table of Contents