V1
c
c
d
e
f
a
Switch box
b
Stop valve attachment plate
c
Earth
d
Cable tie
e
Interconnection cable
f
Power supply cable
4 Fix the cables (power supply and interconnection cable) with a
cable tie to the stop valve attachment plate.
5 Route the wiring through the frame and connect it to it.
Routing through
Choose one of the 3 possibilities:
the frame
1
b
a
a Power supply cable
b Interconnection cable
AZQS100~140B8V1B + AZQS100~140B7Y1B
Split system air conditioners
4P3855291 – 2014.08
a
b
Y1
c
c
d
e
f
3
b
a
2
b
a
Connecting to the
When cables are routed from the unit, a
frame
protection sleeve for the conduits (PG
insertions) can be inserted at the knockout
hole.
When you do not use a wire conduit,
protect the wires with vinyl tubes to
prevent the edge of the knockout hole from
cutting the wires.
A Inside of the outdoor unit
B Outside of the outdoor unit
a Wire
b Bush
c Nut
d Frame
e Hose
6 Reattach the service cover. See
unit" on page 20.
7 Connect an earth leakage circuit breaker and fuse to the power
supply line.
6.8
Finishing the outdoor unit
installation
6.8.1
To finish the outdoor unit installation
1 Insulate and fix the refrigerant piping and interconnection cable
as follows:
c
a
d
b
e
f
a
Gas pipe
b
Gas pipe insulation
c
Interconnection cable
d
Liquid pipe
e
Liquid pipe insulation
f
Finishing tape
2 Install the service cover.
6 Installation
A B
a b c
d
e
"6.8.2 To close the outdoor
Installer reference guide
19
Need help?
Do you have a question about the AZQS100B8V1B and is the answer not in the manual?