Wiring Specifications - Carrier Equipment Touch Installation And Setup Manual

Hide thumbs Also See for Equipment Touch:
Table of Contents

Advertisement

Wire the Equipment Touch in a daisy-chain configuration with up to 5 ZS zone sensors as shown below.
NOTE You do not need to set an address for the Equipment Touch.

Wiring specifications

Power wiring
2-conductor wire 18 AWG for distances up to 100 feet. All transformer secondaries must be grounded. Wiring
connections must be in accordance with NEC and local codes.
Rnet wiring
NOTE If you wire the Equipment Touch directly to the controller's Rnet port, you can use a 2-conductor cable
instead of the standard 4-conductor Rnet cable.
Description
Conductor
Maximum length
Insulation
Color Code
Shielding
UL temperature rating
Voltage
Listing
Equipment Touch
Installation and Setup Guide
4-conductor, shielded or unshielded, CMP, plenum rated cable
22 AWG (7x0096) bare copper
500 feet (152 meters)
Low-smoke PVC (or equivalent)
Black, white, green, red
If shielded, Aluminum/Mylar shield (100% coverage) with TC drain wire
32–167°F (0–75°C)
300 Vac, power limited
UL: NEC CL2P, or better
15
Wiring and mounting the Equipment Touch
CARRIER CORPORATION ©2019
All rights reserved

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents